With Lake Hartwell running low, shallow docks are ending up on the mud. If yours is one of them, the fix is often to move it out to deeper water, within the rules of your Corps permit.
Why are Hartwell docks running aground?
Because the lake is being held lower than it used to be, and drought has pulled it lower still. Since August 26, 2026, the Corps’ guide curve has been 656 ft year-round with a 662 ft cap, and the lake read about 649 ft in mid-October 2026.
The old guide curve was 660 ft in summer and 656 ft in winter. The Corps lowered it because of seepage under the saddle dike at the Clemson Lower Diversion Dam, and says the fix could take five to ten years or more. The region is also about 30 inches of rain behind since January 2025, and the Corps has warned that shallow docks will sit dry more often. The record low, 637.5 ft in December 2008, shows how far the lake can fall. The Corps’ lake level page has the current notice.
How do I know my dock needs moving?
If the dock rests on the bottom, or your boat can’t get on and off the lift, it is time to look at a move. Other signs:
- The shore end sits on mud and the deck tilts toward the bank.
- The frame twists or creaks as the floats settle unevenly.
- The lift can’t lower the boat far enough to float it off.
- You wade out or drag the boat to launch.
- Rocks or stumps show near the slip that you never saw before.
What does moving a dock involve?
A depth survey, new anchors and a longer connection to the bank.
- We visit the site and measure water depth along your shore to find the new spot.
- The walkway or gangway, cables and power are disconnected.
- The dock is floated out and new anchors are set.
- The walkway or gangway is lengthened to reach it.
- Cables are re-run so the dock rides up and down without drifting.
- A licensed electrician we bring in re-checks the wiring before the power goes back on.
What rules still apply on Hartwell?
The dock stays under your Shoreline Use Permit, so the new spot has to fit it. Call the lake office at 706-856-0300 before anything moves.
Local builders cite a minimum of 4 ft of water at the gangwalk connection, so check that with the lake office too. The plan itself calls for docks perpendicular to the shore, at least 50 ft from other facilities, with no side over 40 ft. The Lake Hartwell dock permit guide covers the rest.
How much does it cost to move a dock?
Our ballpark is $2,000–$6,000 for the move, plus $100–$250 for each extra foot of walkway or gangway. These are rough figures, because every bank is different.
The slope of the lake bed decides how far out the dock has to go. A gentle slope can mean a long walkway; a steep bank may need only a few feet. We price it once we’ve measured the depth. The low-water guide for Hartwell docks covers other options too.
Do Lake Keowee docks need moving?
Rarely. Duke Energy usually holds Keowee within a few feet of its 800 ft full pond, so Keowee docks seldom ground the way Hartwell’s are now.
If yours is touching bottom, call us. Duke requires prior written authorization for modifications, so ask Duke Energy Lake Services (800-443-5193) before a Keowee dock moves.
Tell us roughly how deep the water is at the end of your dock in the quote form, or call (424) 423‑9302, and we’ll come out and measure.