Seneca Dock Co.

Dock builder in Seneca, SC

New docks, repairs, boat lifts and low-water moves on Lake Keowee and the South Carolina shore of Lake Hartwell.

New docks run about $40–⁠$60 a square foot of deck. Draw yours below and see the ballpark.

Price your dock
Lake Keowee in autumn, with a covered dock below the bank

Price your dock

768 sq ft overall, 432 sq ft of deck

Inside Keowee’s 1,000 sq ft limit. Duke counts the walkway and roof as well, so a long walkway leaves less room for deck.

The job

Step 1 of 2. Pick what you need and see a ballpark as you go.

What do you need?
Which lake?
24 ft
32 ft
Boat slips
Walkway from the bank
What needs fixing? Pick all that apply.
6
200
Lift size, by the boat’s weight with fuel and gear
How many?
20 ft

Not sure? Guess. We measure the depth before we move anything.

100 ft

$41,500–$68,000

Plus about $1,000 in Duke Energy permit and habitat fees, paid to Duke.

A ballpark, not a quote. We firm it up after a look at the water depth, the bank and the way in.

Where should we send it?

Step 2 of 2. New dock on Lake Keowee: 24 × 32 ft, one slip, roofed, walkway under 20 ft (768 sq ft overall, 432 sq ft of deck). Ballpark $41,500–$68,000.

Best way to reach you

What happens next: We read your request, then come out to measure the water and the bank before giving a firm price. We reply within one working day.

Lake Keowee

Clear, deep and held steady by Duke Energy, which permits every dock.

Duke allows up to two slips and counts the walkway and roof inside the 1,000 sq ft. A new dock pays about $1,000 in Duke permit and habitat fees, and the permit runs one year, so the dock is built inside it. Flotation has to be encapsulated.

Towns on this shore: Seneca, Salem, Sunset, Six Mile, West Union.

1,000 sq ft, the largest dock Keowee allows

Lake Keowee docks

Lake Hartwell

The Army Corps’ lake, 962 miles of shore, and running low.

Your lot needs 75 ft of boundary on green, Limited Development shoreline. The gangwalk doesn’t count toward the 1,120 sq ft, and no side may pass 40 ft. The Corps charges $835 for a five-year permit that ends when the house is sold. Since August 26, 2026 the lake is held at 656 ft all year.

Towns on this shore: Seneca, Clemson, Anderson, Fair Play, Westminster, Townville, Pendleton, Starr, Sandy Springs.

1,120 sq ft, the largest dock Hartwell allows

Lake Hartwell docks

656 ft

Hartwell’s full level all year since August 26, 2026. It used to rise to 660 ft every summer. The Corps expects the limit to last five to ten years, by the Corps’ estimate.

Hartwell is running low

Seepage under the saddle dike at the Clemson Lower Diversion Dam made the Corps cap the lake at 662 ft and hold it at 656. Add a dry two years and docks in shallow coves are sitting on the clay.

649 ft

Roughly where the lake sat in mid-October 2026.

637.5 ft

The record low, December 2008.

Levels from the US Army Corps of Engineers, Savannah District. Check the Corps’ page for today’s reading.

Lake Keowee from Keowee-Toxaway State Park

What the lakes require

Keowee

A Duke permit first

Duke Energy Lake Services authorizes new docks and most repairs. Applications go in online, with a survey and a plan and profile drawing.

1,000 sq ft, all in

Duke counts the dock, the walkway and the roof together, with up to two slips.

One year to build

A Keowee permit is good for a year, so the dock goes in inside that window.

Hartwell

A green-zone lot

The Corps allows a private dock only where a lot shares 75 ft of boundary with Limited Development shoreline.

1,120 sq ft, 40 ft a side

The gangwalk is not counted. No new enclosed rooms, and an upper deck stays open to the sky.

Five years, then renew

The permit runs five years and ends when the house is sold. The buyer applies again.

Both lakes

Encapsulated floats

Bare foam had to come off Keowee by 2018. Hartwell floats need a warranty of at least eight years.

Wiring to marina code

Dock power follows the National Electrical Code for marinas and is done by a licensed electrician.

County permits too

Oconee, Pickens and Anderson counties have their own building and electrical permits for dock work.

The details, with sources: Lake Keowee dock permits and Lake Hartwell dock permits. Rules and fees change, so we confirm them with Duke or the Corps on every job.

From call to dock

A new dock takes about three to four months from the first call: roughly a month for the permit and two to three to build, by one Seneca builder’s account. Repairs and moves are usually quicker, but on Keowee many still need Duke’s go-ahead.

Price it

Price it

Draw the dock in the estimator, or call or text a photo. You get a ballpark straight away and we set a time to come out.

Site visit

Site visit

We sound the water at the end of where the dock will sit, look at the bank and the way in, and check the lot against Duke’s rules or the Corps’ shoreline map.

Plans and permit

Plans and permit

We draw the plan and profile and file the application: with Duke Energy Lake Services for Keowee, with the Corps’ Hartwell office for Hartwell, plus the county permits.

Build

Build

The frame, floats and decking go together, the dock is set and anchored with cables to the bank, and the walkway or gangway goes in.

Power and handover

Power and handover

A licensed electrician wires the dock to marina code where there is power. We walk the dock with you and leave the permit papers with you.

How long a new dock takes, stage by stage

Questions we get

CostHow much does a new dock cost on Keowee or Hartwell?

Most new docks here run about $40–⁠$60 a square foot of deck, plus $28–⁠$48 a square foot if it has a roof, $8,000–⁠$15,000 for each boat lift and the walkway. Lake permit fees are on top: about $1,000 on Keowee and $835 on Hartwell.

PermitsDo I need a permit to build or fix a dock?

Yes for a new dock on either lake. On Keowee, Duke Energy says a permit is most likely needed to build, maintain or change a dock too. On Hartwell, the Corps permits the dock and the permit has to be renewed every five years and when the house is sold.

TimingHow long does a new dock take?

Plan on three to four months from the first call: about a month for the permit and two to three months to build. Repairs are often done in a visit or two once any permit is in hand.

Low waterMy Hartwell dock is sitting on the bottom. What can I do?

Get the weight off the floats, then move the dock out to deeper water and lengthen the walkway to reach it. Since August 26, 2026 the Corps holds Hartwell at 656 ft all year, so a dock set for the old summer level may stay short of water. A move runs about $2,000–⁠$6,000 plus $100–⁠$250 for each extra foot of walkway.

SizeHow big can my dock be?

Up to 1,000 sq ft on Keowee, counting the walkway and roof, and up to 1,120 sq ft on Hartwell, not counting the gangwalk, with no side longer than 40 ft. Cove width, neighbors and water depth can make the real limit smaller.

RepairsIs there a minimum charge for repairs?

Yes, a repair visit starts at $350, because every job means getting the work boat and crew to your dock. Several small repairs on the same visit share that cost.