Seneca Dock Co.

Buying a house with a dock

Buying a lake house? A Lake Hartwell dock permit transfer is really a new permit. What to do, what to ask Duke on Keowee, and a dock checklist for closing.

Published . Updated . A 5 minute read.

Lake Hartwell at Clemson after sunset, the far shore dark against an orange sky

On both lakes, the permit behind a dock does not simply come with the deed. On Lake Hartwell the old permit ends at the sale, and on Lake Keowee Duke Energy has its own process and fee. Here is what happens on each lake, and what to check before you close.

Does a Lake Hartwell dock permit transfer to the buyer?

No. Under the Corps’ 2020 Shoreline Management Plan, the permit becomes void when the house sells, and the new owner must contact the Hartwell office within 14 days to get a new five-year permit.

The rules are in the 2020 Hartwell Shoreline Management Plan. The office is at 5625 Anderson Hwy, Hartwell GA, on 706-856-0300. Put the 14-day deadline on your closing calendar.

The sources we have list the fee for a new or reissued permit as $835. Older figures were $400 for a new permit and $175 for a renewal, and the timing of the increase is unclear, so confirm the fee with the lake office. Our Lake Hartwell dock permit guide covers the rest.

Some grandfathered docks have to go

Some docks built before 1973 are grandfathered under the plan and must be removed when the house sells. Ask the seller for the permit and its history before you sign. If the dock has to come out, you have six months to install a replacement, and it must meet today’s rules: no more than 1,120 sq ft not counting the gangwalk, no side over 40 ft, plans approved by a state-licensed structural engineer, and marine-grade flotation.

Buying a used dock to replace it

Local builders sometimes list used docks for sale. If you buy one for a Hartwell lot, expect the Corps to ask for that dock’s old permit number or for plans approved by a state-licensed structural engineer. Ask the office which it will accept before you pay for the dock.

The wiring is re-inspected every five years

Dock wiring on Hartwell must meet NEC Article 555 and be certified by a licensed electrician, and it is re-inspected every five years before a permit is renewed (for permits expiring on or after February 1, 2021). Ask when the wiring was last certified. If it was nearly five years ago, budget for an electrician.

What happens to a Lake Keowee dock permit at sale?

Keowee docks are permitted by Duke Energy, not the Corps. There is a transfer fee, but the figures in circulation conflict, so get the current amount from Duke Energy Lake Services before closing.

Call Lake Services on 800-443-5193, or see Duke’s permits and shoreline activities page. Ask how the permit moves to you, what the fee is today, and whether the dock meets current rules.

According to a Duke Energy release, unencapsulated foam had to be removed from Keowee docks by September 1, 2018, so a dock still floating on bare foam needs new flotation. Size counts as well: local builders summarize Duke’s 2014 guidelines as capping a dock at 1,000 sq ft, counting walkway and roof, so confirm the limit with Duke if the dock looks large. If the dock needs work, Duke’s FAQ says a permit is “most likely” needed to maintain or modify it. Our Lake Keowee dock permit guide has more.

What should you check on the dock before closing?

Check the floats, frame, cables and anchors, decking, gangway, wiring, any lift, and the depth of water under the dock at today’s lake level. Then check the paperwork.

Take this list on your walk-through:

  • Floats: the dock sits level, with no cracked, waterlogged or bare-foam floats.
  • Frame: no rust flaking at welds or bolts, no soft wood at the joints, no twist as you cross the deck.
  • Cables and anchors: cables tight and unfrayed, fittings not rusted through, and the dock where it should be.
  • Decking: no soft, split or loose boards.
  • Gangway: hinges and rollers move freely, rails are solid, and the slope is walkable at today’s level.
  • Wiring: GFCI protection, junction boxes mounted well above the deck (Pickens County’s guide says at least 24 in), and the date it was last certified.
  • Lift: it runs up and down smoothly, and its rated capacity suits your boat.
  • Water depth: measured at the end of the gangway and in the slip, at today’s level.
  • Paperwork: the permit, its number and date, any engineer-approved plans, and the electrical certificate.

Why depth matters most on Hartwell right now

Hartwell is being held low. On August 26, 2026 the Corps set a year-round guide curve of 656 ft with a 662 ft cap, because of seepage under the saddle dike at the Clemson Lower Diversion Dam, and the fix could take five to ten years or more. In mid-October 2026 the lake stood at about 649 ft. The Corps’ lake level restrictions page warns that shallow docks will sit dry more often.

Listing photos taken at a fuller lake tell you little, so measure at today’s level. Local builders cite a minimum of 4 ft of water at the gangwalk connection; confirm it with the lake office. If the dock is short of water, read our guide to low-water docks on Lake Hartwell and price a dock relocation into your offer.

Do HOA or community rules apply to the dock?

They can in gated communities. Some have community docks with slips, and the association can set its own dock rules on top of Duke’s or the Corps’.

Keowee Key in Salem has community docks, and gated condo communities in Anderson such as Harbor Gate, Overlook, Regatta and Leeward Landing have community docks on Hartwell. Ask the association for its dock rules, whether a slip goes with the property, and what it costs each year.

Can someone look the dock over before you buy?

Yes. We visit, look the dock over and measure the water depth, then give you ballpark prices for anything that needs repair. It is a builder’s opinion, not a certified inspection.

Our repair or replace guide lists ballpark repair ranges, such as $150–⁠$400 per float and $300–⁠$1,800 for cables, anchors and re-leveling.

Send us the address and your closing date through the quote form, or call (424) 423‑9302, and we will set up a visit.

Quick answers

Old docksIs a pre-1973 dock on Lake Hartwell a problem for a buyer?

It can be. The Corps' 2020 Shoreline Management Plan says some grandfathered docks from before 1973 must be removed when the house sells, and the buyer then has six months to install a replacement that meets today's rules.

CostWhat does a new Hartwell dock permit cost after a sale?

The sources we have list $835 for a new or reissued five-year permit, but older figures differ. Confirm the current fee with the Hartwell lake office on 706-856-0300.

KeoweeWho do I call about a Lake Keowee dock when I buy the house?

Duke Energy Lake Services, on 800-443-5193 or at LakeServices@duke-energy.com. Ask how the permit moves to you, what the transfer fee is today, and whether the dock meets current rules.

InspectionIs your pre-purchase dock visit a certified inspection?

No. We visit, look the dock over and measure the water depth, then tell you what we found and what any repairs would cost as a ballpark. It is a dock builder's opinion, not a certified inspection.